18 Aug 2019

The Sleep Center project consisted of a newly renovated space that includes 4 sleep rooms, 4 private bathrooms, kitchen nook, waiting area, control room, private office, and staff areas.

The Occupational Health project consisted of a newly renovated space including exam rooms, bathrooms, kitchen nook, waiting area, private office and staff areas.

01 May 2019

White Plains Hospital, located in Armonk, NY, is one of Westchester County’s premier outpatient facilities offering a wide variety of patient services. This 25,000 square foot facility offers an Urgent Care Center, Primary Physician Practice, Physical Therapy Center and a full Radiology Department making it a full service center for the many residents of Westchester. This space, once an old warehouse, was transformed into a luxury medical center with many exciting architectural features and high end finishes. GTL Construction was contracted to fit-out this space, teaming up with the many consultants on the White Plains Hospital team. The interior of the old warehouse was completely demolished to give the design team the ability to design the space capturing all elements desired by the hospital staff. The scope of work entailed all new sub slab plumbing, complete new electrical distribution, a state of the art mechanical system with an independent chiller plant for the MRI suite, new sprinkler service, over 140 offices, exam rooms and bathrooms, and an entrance lobby/ corridor called “Main Street”. This area of the facility features custom tile from Italy, high end custom millwork, new storefront with full height glass partitions and an amazing 100 foot long skylight that was cut into the existing roof creating an ambiance that is unmatched. Along with the MRI suite, GTL constructed the infrastructure for a CT scan, X-Ray, Bone Density, Mammography and Ultrasound suites. Being that the hospital wanted to create such a beautiful and elegant interior, GTL was also given the contract to compete the exterior portion of the project. The brick façade of the building was covered completely using a stucco system called EIFS which created a much more attractive appearance. The main entrance to the hospital features a new glass storefront with sliding doors, a new tile patio entry and Alucabond metal paneling giving the look of a sleek and modernized facility. The client spared no expense during construction making the total cost over $7.5 million and in return has created one of the most prestigious medical centers in Westchester.

07 May 2019

Client Name: New Jersey Urology

Project Address: 1033 Clifton Avenue Clifton, New Jersey

Architect: F.J. Rawding Architecture

Project Type: Medical – Corporate

Project Size: 4,000 SF

Completion: 100 %

  • Repeat client.
  • Project consisted of multiple phases to keep facility operational.
  • Furnished and installed new handicap restroom and additional bathrooms of exam rooms throughout.
  • Renovated office with new millwork throughout.
  • Provided new LVT flooring throughout space.
  • Retrofitted all doors with new hardware including new pocket doors.
  • Created new reception area.
01 May 2019

Client Name: Zoll Medical Corporation

Project Address: 169 Lakawanna Avenue Parsippany, New Jersey

Architect: Jarmel Kizel

Project Type: Corporate / Tech

Project Size: 24,300 SF

Completion: 100 %

The project relocated the facility to a larger, more modern space. The relocation housed the client comfortably in an area of approximately 25,000 sf. The space includes office space and a product laboratory. The product laboratory uses oxygen in testing products and exterior oxygen tanks were installed and housed in a shed structure.

  • 17,300 SF Office
  • 7,000 SF of lab/Manufacturing Area
  • Project completed with in 10 weeks.